11. Control lot sizes and timing rules
Use order modifiers such as minimum order quantity, maximum order quantity, order multiple, lot accumulation period, rescheduling period, dampener period, and overflow level. These settings keep planning suggestions realistic instead of mathematically perfect but unusable.